Motorists should brace themselves as heavy traffic will be experienced along Sandoval Avenue, Pinagbuhatan, Pasig City starting today, May 15, according to the local government unit (LGU) of Pasig.
Matinding trapik, asahan sa rehabilitasyon ng drainage system sa Sandoval Ave., Pinagbuhatan, Pasig City. | @dzrh5 Val Gonzales, DZRH News #DosPorDos #SamaSamaTayoPilipino
— DZRH NEWS (@dzrhnews) May 14, 2024
REPORT: https://t.co/wztqi4KpDS pic.twitter.com/GCxCanSBea
This move was made due to the Department of Public Works and Highways' rehabilitation project of a drainage system.
In an advisory, the Pasig LGU said the heavy traffic will be felt from 9 AM to 4 PM and will resume at 10 PM to 5 AM.
The heavy traffic includes Sandoval Avenue's Centennial 2 to Villa Cuana-Southbound.
The Pasig LGU said the project will be finished by December 31, 2024.